Saturday, December 13, 2014

A cute finish


I have made a doll's armchair. 
Doesn't she look comfortable.

Monday, December 8, 2014

More for December

I finished two more little girls dresses after procrastinating about putting the zippers in.

There is hopefully enough time left in the year for some more finishes so that I can get my number to over 100.



Monday, December 1, 2014

another finish

This was a quick finish of a toddler hat and jacket.
The yarn was left over in my stash and I was able to use it all up.






Sunday, November 23, 2014

November

 I have made two laundry bags for Aussie Hero Quilts



I have made two quilts as well.




Here are another 24 washcloths.

I have made a wiggles costume for DGD for Christmas 


And one for her doll as well.

My October

This is the other doll nightie and matching knickers.


Some washcloths I have crocheted.
I have made 20 of these.




Tuesday, September 30, 2014

Busy September


I have had a productive September.
First finish was a washcloth.
The pattern is from knitpicks.
They have 52 free washcloth patterns being released this year




My next was my first top down sweater knitted for DD#1.
I enjoyed knitting it and the finished sweater fitted perfectly.
The pattern was from ravelry




DGD need some things made for her dolls, so I have finished a nightgown, mattresses and pillows and quilts.
I have one nightgown still to make.






I have finished lots of smaller things, including ribbon embroidered lavender sachets, pincushions, scissor keep, and needle cases.








I have started my Christmas sewing with a child's dress and a toddler dress and jacket



I am looking forward to October being a productive month as well

Wednesday, July 16, 2014

July finish

I finished this jacket for DGD.
I could not get the colour to photograph correctly, it is actually emerald green.
Below is a photo of the yarn that was left over!



Saturday, June 28, 2014

June finish

I have managed a June finish even though I have been on the road.


These were fun to knit and will be fun to wear

Sunday, June 1, 2014

27 plus 2

The 27 finishes I am just counting as one project as they were teenage mutant ninja turtle masks for DGS birthday party. 
I have knitted him a sweater as well. 
I made the same sweater for his dad when he was the same age.



I made this stitchery for his dad to decorate his new bar.
I could not get the photo to post the right way around.

Tuesday, May 27, 2014

More baby quilts


I have finished four more baby quilts and it is satisfying to see the tub filling up. 
Four have gone out the door so far this year so I am keeping pace. 





Saturday, May 10, 2014

More May finishes

I am stash busting and making a supply of baby quilts at the same time.
Here are the first four that I  have finished this week










Wednesday, May 7, 2014

Finally, some more finishes

I have finished 4 quilts and two laundry bags to be posted overseas to serving troops

Saturday, February 22, 2014

The first for february

I have my first finish for February, another crochet rug.
I just have two or three more of these to do and then will move onto different fibre projects





January 2014

I have two finishes to start the year.

The first is the Wedding quilt.
You can get a detailed story about it on my other blog


I have finished another crochet rug