Showing posts with label knitting. Show all posts
Showing posts with label knitting. Show all posts

Friday, May 31, 2019

Making progress

I have made progress on the sweater. 
The back is finished and I am halfway up the front. 
Linking to One monthly goal


Tuesday, May 7, 2019

OMG May

I am linking to Elm street for my goal for May.
I am hoping to turn this start into a sweater.
The pattern is Caroline cabled hoodie


Saturday, January 12, 2019

2019 finishalong

I am participating in the 2019 finishalong

These are the projects I am nominating to finish in the first quarter. 

1. Tulip quilt. 
This needs to be quilted, bound and labeled. 


2. Summer Lily.
The cutting is done as well as the strip piecing. 
I have begun cutting the sub units.
I would like the quilt finished by March 7th.


3. Christmas ornaments.
I am doing the 12 days of Christmas set of ornaments by mmmcrafts.
Well, 5 sets actually. 
I am doing the preparation work for all the sets at the one time and plan to have the partridge, pear, turtle dove and French hen finished by the end of March.


4. Postcards from Alaska.
The top is basted and needs to be quilted, bound and labeled. 


5. Knitted Indigenous baby beanies.
These are part of a commitment to make 80 beanies a year for 5 years to support a particular program. 
I did 80 the first year.
I need another 20 this quarter. 
I have done 6 so far.


6. Knitted scarf. 
I knit and crochet what i can for Kogo, an amazing organisation. 
I hope to finish at least one scarf in the first quarter. 



7. Crochet blanket.
Another project for Kogo, this time a crochet blanket .
This is the Sweet pea blanket from Attic 24.
I plan to finish this by the end of March .


8. Blue and white quilt. 
This needs to be quilted,  bound and labeled. 


9. Autumn quilt.
This needs to be quilted,  bound and labeled. 



10. Joannes quilt.

This needs to be quilted,  bound and labeled. 


I look forward to reviewing my progress in 12 weeks time.

Wednesday, May 30, 2018

Catch-up

It has been a long time between posts, so i will start with my first catchup post.
These little pouches are a donation to the Victorian wildlife rescue service to be used for baby marsupials. 





The yarn for this scarf was a donation and the finished product was lovely and warm and donated to KOGO.





This scarf and hat were knitted for a friend of DS#1 who was from Queensland and freezing during officer training in Gippsland in winter.





Another scarf for KOGO.

Saturday, June 3, 2017

Mid year finishes


I have been remiss in posting my finishes so far this year so here is a catch up.

These hearts and bears are for the treasured babies program




A finished baby quilt.






A knitted lace baby shawl





Wedding quilt for DD#1.
King sized bargello quilt





Another baby quilt


Baby quilt 3



Baby quilt 4

Baby quilts 5, 6 and 7







Crochet rug for Hamlin Fistula shop

10 Knitted Joey pouches for Wildlife Victoria



Knitted ballet jacket for DGD

Friday, December 30, 2016

Final finishes for the year


This rug is for the Hamlin Fistula shop.


A knitted jacket for DGD
A sweater for DGS


Another crochet rug

Baby quilt 1

Baby quilt 2

Baby quilt 3

Baby quilt 4

Baby quilt 5

Baby quilt 6

Tuesday, December 29, 2015

Final finishes for 2015


Here are my final finishes for 2015, two scarves, a child's sweater, a baby hoodie and vest.
It has been my most productive year since I started keeping track.
I finished 236 things, ranging from dish cloths to queen sized quilts.
I am looking forward to a great 2016.








Saturday, December 19, 2015

Lots of December finishes


I am finishing the year with good progress.
First up, beaded ornaments.






Two more children's sweaters.




A ballet outfit for DGD doll.


Mittens and a jacket.



Three cushions.

I am hoping for several more finishes this week.